For more information, call 0141 227 3388
email: glasgow@ashragroup.com

Pairc Windfarm, South East Lewis

In 2006 Scottish and Southern Energy (SSE), appointed ASH design + assessment to co-ordinate an Environmental Statement and carry out Landscape and Visual assessment for a proposed wind farm in the Western Isles.

Pairc Windfarm, South East LewisView slideshow of larger images (1/3)

The proposal consisted of 57 Turbines and associated infrastructure situated in the Pairc area of south east Lewis.

Pairc Windfarm environmental statement

A series of consultations, survey and assessment work was undertaken in which ASH worked closely with SSE in co-ordinating constraints, layout and mitigation proposals as part of the Environmental Statement. This resulted in minimal adverse environmental effects, whilst maintaining engineering viability.

ASH carried out a number of assessments including:

  • Planning
  • Socio Economic
  • Recreation and Tourism
  • Landscape and Visual Assessments

The Environmental Statement was published in 2007. Since then ASH has overseen a number of public exhibitions.

Email ASH or call 0141 227 3388 to find out whether ASH design + assessment can provide advice and consultation for your development.

View larger image View larger image

ASH design + assessment is part of the Ashra Group and a trading name of Harris Rush Associates Limited