Inverlael Hydroelectric Scheme

In 2003, ASH design+assessment was appointed by RWE Npower renewables to undertake an Environmental Impact Assessment and prepare an Environmental Statement for Inverlael hydro electric development.

Inverlael Hydroelectric SchemeView slideshow of larger images (1/3)

The 3MW run-of-river scheme is located to the south east of Loch Broom, Wester Ross, within the catchments of the River Lael and Allt Mor.

Inverlael Hydroelectric Scheme environmental statement

ASH project managed the production of the Environmental Statement and provided specialist landscape and visual, land use, recreation and planning inputs and co-ordinated inputs from specialist subconsultants on birds, habitats and animals, electrofishing, fresh water pearl mussels, cultural heritage, noise and vibration.

ASH advised Npower during the development of the design to minimise any adverse environmental impacts resulting from the scheme.

The Environmental Statement accompanied the Section 36 Application in January 2005. Consent was given by Scottish Ministers in summer 2007 and construction is programmed to start in 2008.

The proposal comprises two intakes on upland burns, a series of associated buried pipes to convey the water to a new powerhouse, two pipe bridges, a substation located within the powerhouse building and the construction of temporary and permanent access tracks.

Email ASH or call 0141 227 3388 to find out whether ASH design + assessment can provide advice and consultation for your development.

View larger image View larger image

ASH design + assessment is part of the Ashra Group and a trading name of Harris Rush Associates Limited